A major structural milestone achieved at Eliseo Bali Jimbaran!
As of June 26, we have successfully poured the first-floor concrete slab. Utilizing high-capacity concrete boom pumps and mixers provided by Karya Beton, our dedicated site crew poured and leveled the entire elevated slab with absolute precision. The building structure is rapidly expanding vertically, backed by robust scaffolding and formwork systems.
Current Progress:
-
First-floor elevated slab fully poured and finished.
-
Heavy-equipment concrete pumping successfully executed.
-
Full structural scaffolding and formwork erected for vertical elements.
-
On-site team and engineering coordination finalized for the next story.
Construction gallery