Construction at Eliseo Bali Jimbaran is moving forward smoothly! During our latest site inspection with the build team, we reviewed the structural progress across the plot.
Formwork for the column footings has been precisely positioned, and the vertical structural rebar cages are now fully raised. The foundation network is taking shape, paving the way for the upcoming concrete pouring stage.
Current Progress:
-
Assembly and layout of column footing formwork
-
Complete installation of vertical steel column reinforcement
-
On-site engineering inspection and quality management

Up Next:
-
Foundation concrete pouring
-
Column formwork setting
-
Underground utility routing